I24 over SR 2

2.9 MI E OF GA STATE LINE · County 065, Tennessee · Built 1964 · 2 Lanes · 64,258 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
33I00240003
Year Built
1964
Length
54.3 m (178.1 ft)
Max Span
17.1 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
64,258
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,179,000
Total Project Cost
$1,769,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.