FAU 4988 over MACKEY BRANCH

2 MI EAST OF I75 & SR 153 · County 065, Tennessee · Built 1989 · 2 Lanes · 7,946 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
330E2780003
Year Built
1989
Length
10.1 m (33.1 ft)
Max Span
3 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
7,946
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.