FAU 3633 841976T over SOUTHERN RAILWAY

IN SODDY-DAISY · County 065, Tennessee · Built 1928 · 2 Lanes · 7,960 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
33036330021
Year Built
1928
Reconstructed
1961
Length
54.6 m (179.1 ft)
Max Span
15.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
7,960
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,811,000
Total Project Cost
$2,717,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.