FAP 34 over THOMPSON CREEK

2.2 M NW OF MORRISTOWN · County 063, Tennessee · Built 1967 · 4 Lanes · 12,215 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
32SR0340005
Year Built
1967
Length
7.2 m (23.6 ft)
Max Span
3 m
Width
68 m (223.1 ft)
Lanes
4
Daily Traffic
12,215
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$237,000
Total Project Cost
$356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.