FAP 32 over HOLSTON RIVER
ON HANBLEN-GRANGER CO.LN. · County 063, Tennessee · Built 1982 · 4 Lanes · 22,479 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
36.26125, -83.283897
This bridge is in worse condition than 73.9% of bridges in County 063. The average bridge in Tennessee is 0 years old; this one is 44 years old.
Nearby Bridges
FAP 32 over SR 343 RL
Built 1975
FAP 32 over SR 343 LL
Built 1975
NFA 1324 (SA 3216) over SPRING CREEK
Built 1950
NFA A314 over SPRING CREEK
Built 2022
NFA A276 over SPRING CREEK
Built 1991
FAP 32 over STUBBLEFIELD CREEK
Built 1975
NFA A287 over STUBBLEFIELD CREEK
Built 1970
NFA A004 over HAVELY SPRINGS BRANCH
Built 1987
NFA A759 over TURKEY CREEK
Built 1940
NFA A251 over SPRING BRANCH
Built 1955
Bridge Details
- Structure #
- 32SR0320001
- Year Built
- 1982
- Length
- 522.4 m (1713.9 ft)
- Max Span
- 101.5 m
- Width
- 27.4 m (89.9 ft)
- Lanes
- 4
- Daily Traffic
- 22,479
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $38,089,000
- Total Project Cost
- $57,134,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.