FAS 50 over PATTON CREEK

.5 MI.SW.OF PELHAM · County 061, Tennessee · Built 1998 · 2 Lanes · 3,358 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
31SR0500003
Year Built
1998
Length
8 m (26.2 ft)
Max Span
3.7 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
3,358
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.