NFA A023 over BRANCH

8.5 M NW OF ALTAMONT · County 061, Tennessee · Built 1970 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

35.4906, -85.851831

This bridge is in worse condition than 69.5% of bridges in County 061. The average bridge in Tennessee is 0 years old; this one is 56 years old.

Nearby Bridges

Bridge Details

Structure #
310A0230003
Year Built
1970
Length
7.7 m (25.3 ft)
Max Span
7.7 m
Width
5.7 m (18.7 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$64,000
Total Project Cost
$97,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.