FAP 107 over NOLICHUCKY RIVER

1.3 M W OF TUSCULUM · County 059, Tennessee · Built 1951 · 2 Lanes · 11,190 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Failed
Deck
0
Failed
Superstructure
0
Failed
Substructure
0
Failed

Bridge Details

Structure #
30SR1070007
Year Built
1951
Reconstructed
1986
Length
180.6 m (592.5 ft)
Max Span
30.7 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
11,190
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,373,000
Total Project Cost
$2,060,000