NFA 2521 (SA 3011) over HOLLEY CREEK

SW OF TUSCULUM · County 059, Tennessee · Built 1984 · 6 Lanes · 1,232 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
30025210001
Year Built
1984
Length
6.3 m (20.7 ft)
Max Span
3 m
Width
9.1 m (29.9 ft)
Lanes
6
Daily Traffic
1,232
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$255,000
Total Project Cost
$383,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.