NFA A801 over BUCHANNAN CREEK

4.8 MI.E.OF PULASKI · County 055, Tennessee · Built 1929 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
28SR0150025
Year Built
1929
Reconstructed
1964
Length
30.2 m (99.1 ft)
Max Span
10.1 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$504,000
Total Project Cost
$757,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.