FAP 7 over BUCHANAN CREEK

4.9 MI.NW.OF ELKTON · County 055, Tennessee · Built 1921 · 2 Lanes · 4,416 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
28SR0070017
Year Built
1921
Reconstructed
1955
Length
37.3 m (122.4 ft)
Max Span
7.4 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
4,416
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$231,000
Total Project Cost
$347,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.