FAS 152 over SUGAR CREEK

1.71 MI.E. JCT. SH 76 · County 053, Tennessee · Built 1987 · 2 Lanes · 2,232 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
27SR1520017
Year Built
1987
Length
35.1 m (115.2 ft)
Max Span
12.2 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
2,232
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.