FAP 76 over WOLF CREEK

IN MILAN CITY LIMITS · County 053, Tennessee · Built 2013 · 2 Lanes · 8,087 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
27SR0760013
Year Built
2013
Length
54.9 m (180.1 ft)
Max Span
18.5 m
Width
29.3 m (96.1 ft)
Lanes
2
Daily Traffic
8,087
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.