FAP 5 over BRANCH

3.0 MI. NORTH OF HUMBOLT · County 053, Tennessee · Built 2000 · 4 Lanes · 8,860 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
27SR0050051
Year Built
2000
Length
11.3 m (37.1 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
8,860
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$372,000
Total Project Cost
$559,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.