NFA A379 (SA 2711) over BRANCH FORKED DEER RIVER

4.6 MI N JCT SR76&SR186 · County 053, Tennessee · Built 1958 · 2 Lanes · 790 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
270A3790007
Year Built
1958
Length
28 m (91.9 ft)
Max Span
9.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
790
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$120,000
Total Project Cost
$181,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.