NFA A313 over BRANCH OF DOLAN CREEK

3.9 MI SE JCT SR43&SR54 · County 053, Tennessee · Built 2000 · 2 Lanes · 70 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
270A3130003
Year Built
2000
Length
11.8 m (38.7 ft)
Max Span
5.9 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
70
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$166,000
Total Project Cost
$250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.