NFA A114 over BR RUTHERFORD FORK OBION

0.6 MI SW JCT SR5&SR89 · County 053, Tennessee · Built 2015 · 2 Lanes · 10 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
270A1140001
Year Built
2015
Length
10.6 m (34.8 ft)
Max Span
5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
10
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.