NFA A029 over COOL SPRINGS BRANCH

1.2 MI NE JCT SR105&DYER · County 053, Tennessee · Built 2008 · 2 Lanes · 100 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
270A0290005
Year Built
2008
Length
7 m (23 ft)
Max Span
3.4 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
100
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.