FAU 130 over BOILING FORK CREEK
IN WINCHESTER CITY LIMITS · County 051, Tennessee · Built 1966 · 2 Lanes · 6,706 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.201706, -86.127286
This bridge is in worse condition than 84.1% of bridges in County 051. The average bridge in Tennessee is 0 years old; this one is 60 years old.
Nearby Bridges
FAU 3498 over WAGNER CREEK
Built 1970
LYNCHBURG HWY. over DRY CREEK
Built 1966
FAP 16 over BOILING FORK CREEK
Built 1941
FAP 15 over ABANDONED CSX RAILROAD
Built 1937
FAP 16 over BRANCH
Built 2017
CHATTIN BOULEVARD over BRANCH
Built 2015
FAP 16 over WAGNER CREEK
Built 1941
FAS 130 over ELK RIVER
Built 1966
NFA A406 over WAGNER CREEK
Built 1985
FAP 15 over DRY CREEK
Built 1963
Bridge Details
- Structure #
- 26SR1300005
- Year Built
- 1966
- Length
- 78.6 m (257.9 ft)
- Max Span
- 20.4 m
- Width
- 10.9 m (35.8 ft)
- Lanes
- 2
- Daily Traffic
- 6,706
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $670,000
- Total Project Cost
- $1,006,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.