FAS 50 over ELK RIVER

NEAR GRUNDY CO. LINE · County 051, Tennessee · Built 1950 · 2 Lanes · 1,339 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
26SR0500001
Year Built
1950
Reconstructed
2013
Length
166.6 m (546.6 ft)
Max Span
24.4 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
1,339
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$783,000
Total Project Cost
$1,175,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.