NFA A119 over BRANCH

3.7 MI SW JCT SR15&HARDEM · County 047, Tennessee · Built 1983 · 2 Lanes · 40 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
240A1190007
Year Built
1983
Length
11.9 m (39 ft)
Max Span
3.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
40
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$164,000
Total Project Cost
$247,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.