FAP 56 over PINE CREEK

1.9 MI.S.OF SMITHVILLE · County 041, Tennessee · Built 2023 · 2 Lanes · 6,921 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
21SR0560021
Year Built
2023
Length
73.2 m (240.2 ft)
Max Span
24.5 m
Width
18.7 m (61.4 ft)
Lanes
2
Daily Traffic
6,921
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000
Total Project Cost
$470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.