FAP 56 over CANEY FORK RIVER

AT PEDIGO RIDGE RD. · County 041, Tennessee · Built 1949 · 2 Lanes · 3,861 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
21SR0560007
Year Built
1949
Reconstructed
2013
Length
544.7 m (1787.1 ft)
Max Span
118 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
3,861
Material
Steel Continuous
Design
Truss - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.