FAP 26 over OVERFLOW OF DRY CREEK

IN DOWELLTOWN CITY LIMITS · County 041, Tennessee · Built 2004 · 4 Lanes · 8,478 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
21SR0260011
Year Built
2004
Length
70 m (229.7 ft)
Max Span
23.6 m
Width
25.2 m (82.7 ft)
Lanes
4
Daily Traffic
8,478
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,707,000
Total Project Cost
$4,061,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.