FAP 20 over TENNESSEE RIVER

AT PERRY-DECATUR CO.LINE · County 039, Tennessee · Built 1987 · 2 Lanes · 2,924 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
20SR0200013
Year Built
1987
Reconstructed
2006
Length
894.9 m (2936 ft)
Max Span
134.1 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
2,924
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$46,300,000
Total Project Cost
$69,451,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.