FAP 408 (SR 155) over CUMBERLAND RIVER

3 M NE I40 · County 037, Tennessee · Built 1985 · 4 Lanes · 42,389 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
19SR1550029
Year Built
1985
Length
327.4 m (1074.1 ft)
Max Span
102.1 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
42,389
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.