FAP 11 over BRANCH

.5 M N SR255&SR11 · County 037, Tennessee · Built 1928 · 5 Lanes · 31,559 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
19SR0110005
Year Built
1928
Reconstructed
1966
Length
8.2 m (26.9 ft)
Max Span
3.7 m
Lanes
5
Daily Traffic
31,559
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$385,000
Total Project Cost
$578,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.