FAU 6 over STR 2 / RMP SD TO 3252
.5 M N SR6&ELLINGTON IC · County 037, Tennessee · Built 1965 · 5 Lanes · 17,296 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
36.172603, -86.765811
This bridge is in worse condition than 81.4% of bridges in County 037. The average bridge in Tennessee is 0 years old; this one is 61 years old.
Nearby Bridges
FAU 6 over STR 17@ ELLINGTON PKY I/
Built 1965
FAU 6 over STR 18@ ELLINGTON PKY I/
Built 1965
FAU 11 over STR 13@ ELLINGTON PKY I/
Built 1965
I24 over I24 / WOODLAND STREET
Built 1961
I24 over I24 / MAIN STREET
Built 1961
FAU 6 over STR 14@ ELLINGTON PKY I/
Built 1965
FAU 6 over STR 19@ ELLINGTON PKY I/
Built 1967
FAU 6 over STR 12@ ELLINGTON PKY I/
Built 1965
FAU 6 over STR 16@ ELLINGTON PKY I/
Built 1965
FAU 11 350181W over SR11/ELLINGTON PKWY&CSXR
Built 1965
Bridge Details
- Structure #
- 19SR0060017
- Year Built
- 1965
- Length
- 32.9 m (107.9 ft)
- Max Span
- 13.4 m
- Width
- 21.9 m (71.9 ft)
- Lanes
- 5
- Daily Traffic
- 17,296
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $320,000
- Total Project Cost
- $481,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.