FAP 12 over I65

8TH AV N / I65 · County 037, Tennessee · Built 1967 · 8 Lanes · 14,457 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
19I00650139
Year Built
1967
Reconstructed
2010
Length
103.3 m (338.9 ft)
Max Span
27.4 m
Width
33.1 m (108.6 ft)
Lanes
8
Daily Traffic
14,457
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,084,000
Total Project Cost
$9,127,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.