I-24 EB over CUMBERLAND RIVER

I24-I40 INTERCHANGE-C8 · County 037, Tennessee · Built 1963 · 4 Lanes · 133,050 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
19I00240119
Year Built
1963
Reconstructed
1973
Length
719.9 m (2361.9 ft)
Max Span
97.8 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
133,050
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,339,000
Total Project Cost
$8,009,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.