I-24 EB over CUMBERLAND RIVER
I24-I40 INTERCHANGE-C8 · County 037, Tennessee · Built 1963 · 4 Lanes · 133,050 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
36.158364, -86.7598
This bridge is in worse condition than 81.4% of bridges in County 037. The average bridge in Tennessee is 0 years old; this one is 63 years old.
Nearby Bridges
I-24 WB LANES over CUMBERLAND RIVER
Built 1963
I-24 EB over I-40 WB & HERMITAGE AVE.
Built 1960
FAU 24 over HERMITAGE AVE RL / I24
Built 1960
HERMITAGE AVE. LL over I-24
Built 1960
I40 over I40 RAMP & SR 24
Built 1960
I40 over FAIRFIELD AVE.
Built 1960
I40 over FAIRFIELD AVE
Built 1960
KOREAN VETS BLVD. over CUMBERLAND RIVER
Built 2004
FAU 5333 over SHELBY AVE / I-24
Built 1960
I40 over SR-1- SR-11 & 2ND AVE.
Built 1968
Bridge Details
- Structure #
- 19I00240119
- Year Built
- 1963
- Reconstructed
- 1973
- Length
- 719.9 m (2361.9 ft)
- Max Span
- 97.8 m
- Width
- 20.7 m (67.9 ft)
- Lanes
- 4
- Daily Traffic
- 133,050
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,339,000
- Total Project Cost
- $8,009,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.