FAU 4435 over BRANCH

28TH. AVE CONNECTOR · County 037, Tennessee · Built 1993 · 5 Lanes · 14,870 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
19044350001
Year Built
1993
Length
20.1 m (65.9 ft)
Max Span
5.5 m
Lanes
5
Daily Traffic
14,870
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$736,000
Total Project Cost
$1,105,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.