FAP 68 over SPRING BRANCH

7 MI.SE.OF HOMESTEAD · County 035, Tennessee · Built 1952 · 2 Lanes · 3,482 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
18SR0680003
Year Built
1952
Reconstructed
1998
Length
26.2 m (86 ft)
Max Span
8.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
3,482
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$514,000
Total Project Cost
$772,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.