FAP 1 over OBED RIVER

.53 MI.E.OF CROSSVILLE · County 035, Tennessee · Built 1959 · 2 Lanes · 9,135 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
18SR0010005
Year Built
1959
Length
60.8 m (199.5 ft)
Max Span
8.7 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
9,135
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,880,000
Total Project Cost
$2,821,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.