FAS 152 over BRANCH

SR 152 · County 033, Tennessee · Built 1998 · 2 Lanes · 1,661 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
17SR1520013
Year Built
1998
Length
6.7 m (22 ft)
Max Span
3 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,661
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.