FAS 88 over SR 88 / SR 20

2.4 MI NW JCT SR20&SR76 · County 033, Tennessee · Built 1994 · 2 Lanes · 4,285 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
17SR0200033
Year Built
1994
Length
110.3 m (361.9 ft)
Max Span
55.5 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
4,285
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.