FAP 55 SBL over I24

SR55/I-24 IN MANCHESTER · County 031, Tennessee · Built 1966 · 2 Lanes · 16,822 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
16I00240030
Year Built
1966
Reconstructed
1973
Length
85.7 m (281.2 ft)
Max Span
24.2 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
16,822
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$226,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.