NFA A180 over DUCK RIVER

.4 MI FROM SR 53 · County 031, Tennessee · Built 1960 · 2 Lanes · 530 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
160A1800001
Year Built
1960
Length
42.6 m (139.8 ft)
Max Span
5.7 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
530
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$609,000
Total Project Cost
$914,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.