FAP 9 over SINKING CREEK

AT JCT SR 9 · County 029, Tennessee · Built 1929 · 5 Lanes · 21,011 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
15SR0090003
Year Built
1929
Reconstructed
1979
Length
48.1 m (157.8 ft)
Max Span
9.3 m
Width
25.1 m (82.3 ft)
Lanes
5
Daily Traffic
21,011
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,211,000
Total Project Cost
$1,817,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.