NFA A404 over PIGEON RIVER

S OF I40 2 M W OF HARTFRD · County 029, Tennessee · Built 1981 · 2 Lanes · 250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
150A4050001
Year Built
1981
Length
91.4 m (299.9 ft)
Max Span
22.9 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
250
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.