FAP 63 730805K over SOUTHERN RAILWAY

3.2 M W CUMBLD GP NAP PK · County 025, Tennessee · Built 1969 · 2 Lanes · 7,318 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

36.546586, -83.669869

This bridge is in worse condition than 91.8% of bridges in County 025. The average bridge in Tennessee is 0 years old; this one is 57 years old.

Nearby Bridges

Bridge Details

Structure #
13SR0630011
Year Built
1969
Length
44.6 m (146.3 ft)
Max Span
15.2 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
7,318
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,016,000
Total Project Cost
$1,525,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.