FAP 33 730787P over SOUTHERN RAILWAY

2.1 M E OF TAZEWELL · County 025, Tennessee · Built 1951 · 2 Lanes · 12,422 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
13SR0330003
Year Built
1951
Length
56.5 m (185.4 ft)
Max Span
15 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
12,422
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$687,000
Total Project Cost
$1,031,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.