FAP 100 over BRANCH

3.06 MI.E.HARDEMAN CO.LN. · County 023, Tennessee · Built 1971 · 2 Lanes · 2,908 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
12SR1000005
Year Built
1971
Length
8.2 m (26.9 ft)
Max Span
2.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,908
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$64,000
Total Project Cost
$97,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.