FAS 91 over MILL CREEK

IN THE HOLSTON MT · County 019, Tennessee · Built 2002 · 3 Lanes · 5,380 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
10SR0910017
Year Built
2002
Length
12.3 m (40.4 ft)
Max Span
3.8 m
Width
12.2 m (40 ft)
Lanes
3
Daily Traffic
5,380
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$295,000
Total Project Cost
$443,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.