FAP 37 over DOE RIVER

IN HAMPTON · County 019, Tennessee · Built 1966 · 2 Lanes · 8,340 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
10SR0370015
Year Built
1966
Length
52.5 m (172.2 ft)
Max Span
17.8 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
8,340
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$406,000
Total Project Cost
$610,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.