NFA 1077 (SA 1011) over SULPHER SPRINGS BRANCH

BTWN ELIZABETHTON & WATAU · County 019, Tennessee · Built 2024 · 2 Lanes · 1,005 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
10S25150001
Year Built
2024
Length
6.4 m (21 ft)
Max Span
6.4 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
1,005
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$306,000
Total Project Cost
$460,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.