FAP 22 over ROAN DRAINAGE CANEL

1.9 MI. N. OF HENDERSON C · County 017, Tennessee · Built 1997 · 2 Lanes · 5,228 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
09SR0220004
Year Built
1997
Length
109.1 m (357.9 ft)
Max Span
22.6 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
5,228
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.