FAP 1 over BRANCH

2.8 MI.N.E.OF HUNTINGDON · County 017, Tennessee · Built 1928 · 2 Lanes · 6,139 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
09SR0010021
Year Built
1928
Reconstructed
1997
Length
7.3 m (24 ft)
Max Span
3 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
6,139
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$172,000
Total Project Cost
$259,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.