FAP 53 over ROCKHOUSE CREEK

4.2 MI.NE.OF WOODBURY · County 015, Tennessee · Built 1932 · 2 Lanes · 1,230 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
08SR0530017
Year Built
1932
Length
10.2 m (33.5 ft)
Max Span
2.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,230
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$81,000
Total Project Cost
$122,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.