FAP 53 over HAYES CREEK

.4 MI.N.OF COFFEE CO.LI. · County 015, Tennessee · Built 1934 · 2 Lanes · 2,348 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
08SR0530001
Year Built
1934
Length
6.9 m (22.6 ft)
Max Span
3 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
2,348
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.