FAP 60 over SR 60 / SR 74

IN CLEVELAND · County 011, Tennessee · Built 1972 · 4 Lanes · 29,476 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
06SR0404017
Year Built
1972
Length
68.3 m (224.1 ft)
Max Span
36.9 m
Width
31.7 m (104 ft)
Lanes
4
Daily Traffic
29,476
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.